Version

DateTimeFromPoint Method (UltraTimelineView)

Returns the date/time at the specified point, or null if the specified point lies within an area of the control that is not definitively associated with a date/time.
Overload List
OverloadDescription
DateTimeFromPoint(Point,TimeSlotUIElement)Returns the date/time at the specified point, or null if the specified point lies within an area of the control that is not definitively associated with a date/time.  
DateTimeFromPoint(Point,ColumnHeaderUIElement)Returns the date/time at the specified point, or null if the specified point lies within an area of the control that is not definitively associated with a date/time.  
DateTimeFromPointReturns the DateTime at the specified point, or null if the hit test did not yield a date/time. (Inherited from Infragistics.Win.UltraWinSchedule.ControlWithActivityBase)
Requirements

Target Platforms: Windows 10, Windows 8.1, Windows 8, Windows 7, Windows Server 2012, Windows 7, Windows Vista SP1 or later, Windows XP SP3, Windows Server 2008 (Server Core not supported), Windows Server 2008 R2 (Server Core supported with SP1 or later), Windows Server 2003 SP2

See Also