Version

Flush Method (PieChartBase)

Use to force the pie chart to finish any deferred work before printing or evaluating its visual.
Syntax
'Declaration
 
Public Sub Flush() 
public void Flush()
Remarks
This should only be called if the visual of the pie chart needs to be synchronously saved or evaluated. Calling this method too often will hinder the performance of the pie chart.
Requirements

Target Platforms: Windows 10, Windows 8.1, Windows 8, Windows 7, Windows Server 2012, Windows Vista SP1 or later, Windows XP SP3, Windows Server 2008 (Server Core not supported), Windows Server 2008 R2 (Server Core supported with SP1 or later), Windows Server 2003 SP2

See Also