Ensures that the day represented by the specified date is visible in the
Infragistics.Scheduler.Core.SchedulerViewMode.MonthView, and if not scrolls the date into view.
Parameters
- date
- The date representing the day that should be scrolled into view. The date must fall within the range of the control's MinimumDate and MaximumDate
- animated
- True to perform an animated scroll, false to perform an immediate scroll.
Return Value
True if successful otherwise false.
Target Platforms: Android 4.4+, iOS 8+
Development Environments: Visual Studio 2015+, Visual Studio for Mac Preview, Xamarin for Visual Studio 4.2+